
EMC compliance for low-voltage equipment must be considered in advance during the design phase.
Emission limits: based on GB/T 9254 Class B.
Immunity limits: based on GB/T 17626 series.
Compliance measures: select low-radiation components; optimize PCB layout; strengthen shielding; add filtering protection.
Pre-testing: conduct EMC scanning tests during the R&D phase to identify and rectify any exceeding frequency points. Finally, pass third-party laboratory certification testing.
Through system design, all EMC limit requirements can be met, and CE certification can be obtained.